advertising

Joby Selects Ohio For First eVTOL Scaled Manufacturing Facility

Joby plans to build facility capable of delivering up to 500 aircraft per year; 140-acre site at Dayton International Airport has potential to support significant further growth

advertising

Joby Aviation announced plans to locate its first scaled electric vertical take-off and landing (eVTOL) aircraft production facility in Dayton, Ohio.

Joby plans to build a facility capable of delivering up to 500 aircraft per year at the Dayton International Airport, supporting up to 2,000 jobs. The 140-acre site it has selected has the potential to support significant further growth over time, providing enough land to build up to two million square feet of manufacturing space. Construction of the scaled Ohio facility is expected to start in 2024 and it is expected to come online in 2025. Joby plans to use existing nearby buildings to begin near-term operations.

The State of Ohio, JobsOhio and local political subdivisions have offered incentives and benefits of up to $325 million to support the development of the facility, while Joby plans to invest up to $500 million as it scales operations at the site. Joby is also announcing today that it has been invited by the U.S. Department of Energy to submit a Part II Application for financing under the Title XVII Loan Guarantee Program, which provides access to low-interest loans for clean energy projects and would support the scaling of the facility.

Joby’s production aircraft is designed to transport a pilot and four passengers at speeds of up to 200 mph, with a maximum range of 100 miles and a revolutionary quiet noise profile that is barely audible against the backdrop of cities. The company plans to operate these aircraft as part of aerial ridesharing networks in cities and communities around the world, starting in 2025, building on partnerships it has developed with Delta and Uber.

advertising
Exit mobile version